{"id":654,"date":"2013-09-24T12:06:43","date_gmt":"2013-09-24T12:06:43","guid":{"rendered":"https:\/\/thechappellgroup.com\/?p=654"},"modified":"2013-09-24T12:06:43","modified_gmt":"2013-09-24T12:06:43","slug":"gateway-daytona-marina-2","status":"publish","type":"post","link":"https:\/\/thechappellgroup.com\/?p=654","title":{"rendered":"Gateway Daytona Marina"},"content":{"rendered":"<p><strong>Gateway Daytona Marina<\/strong><br \/>\nDaytona Beach, Volusia County, Florida<\/p>\n<p><strong>Client:<\/strong> Mr. Miceal O\u2019Leary<br \/>\nBlue Water VI, LLC<br \/>\n312 SE 17th Street, 2nd Floor<br \/>\nFort Lauderdale, FL 33316<br \/>\nPhone: (954) 410-4942<\/p>\n<p><strong>Services:<\/strong><\/p>\n<ul>\n<li>Environmental Design<\/li>\n<li>Environmental Permitting<\/li>\n<li>Benthic Survey<\/li>\n<li>City Ordinance Approval<\/li>\n<\/ul>\n<p><strong>Construction Cost:<\/strong> $150,000,000.00<\/p>\n<p>The proposed project consists of the construction of a mixed use development which includes a marina, hotel, restaurant, and retail shops. The proposed marina includes the construction of a concrete deck, t-docks, finger piers and floating docks to accommodate 173 boat slips. In addition, maintenance dredging is proposed to a depth of (-)7.0 ft NGVD to match the historical depth of the surrounding area. The Chappell Group, Inc. (TCG) provided all environmental services for the marina development including the necessary approvals with U.S. Army Corps of Engineers (ACOE), St. Johns River Water Management District (SJRWMD), U.S. Coast Guard (USCG), Florida Fish and Wildlife Conservation Commission (FFWCC), and US Fish and Wildlife Service (FWS). TCG provided all permitting services and design for the every aspect of the marina including the hotel transient dockage, day dockage, and Dock Master\u2019s Office design. Because of the delay in of the slip allocation in the City of Daytona Beach and with the Volusia County MPP, TCG was able to assist with the Client and the City to expedite the drafting of the dock ordinance in order for the marina to be permitted in line with the Client\u2019s timeline for\u00a0completion.<\/p>\n<p><a title=\"Gateway Daytona Marina\" href=\"https:\/\/thechappellgroup.com\/email_060512\/Website%20Cutsheets\/Marine%20&amp;%20Coastal%20Engineering\/Daytona%20Beach%20Marina.pdf\" target=\"_blank\">Download<\/a> | <a title=\"Coastal Engineering &amp; Design\" href=\"https:\/\/thechappellgroup.com\/?page_id=530\">Back to\u00a0Marine &amp; Coastal Engineering<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Gateway Daytona Marina Daytona Beach, Volusia County, Florida Client: Mr. Miceal O\u2019Leary Blue Water VI, LLC 312 SE 17th Street, 2nd Floor Fort Lauderdale, FL 33316 Phone: (954) 410-4942 Services: Environmental Design Environmental Permitting Benthic Survey City Ordinance Approval Construction Cost: $150,000,000.00 The proposed project consists of the construction of a mixed use development which [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":655,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4],"tags":[],"class_list":["post-654","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-cut-sheets"],"_links":{"self":[{"href":"https:\/\/thechappellgroup.com\/index.php?rest_route=\/wp\/v2\/posts\/654","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/thechappellgroup.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/thechappellgroup.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/thechappellgroup.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/thechappellgroup.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=654"}],"version-history":[{"count":1,"href":"https:\/\/thechappellgroup.com\/index.php?rest_route=\/wp\/v2\/posts\/654\/revisions"}],"predecessor-version":[{"id":656,"href":"https:\/\/thechappellgroup.com\/index.php?rest_route=\/wp\/v2\/posts\/654\/revisions\/656"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/thechappellgroup.com\/index.php?rest_route=\/wp\/v2\/media\/655"}],"wp:attachment":[{"href":"https:\/\/thechappellgroup.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=654"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/thechappellgroup.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=654"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/thechappellgroup.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=654"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}