{"id":398,"date":"2013-09-19T17:12:59","date_gmt":"2013-09-19T17:12:59","guid":{"rendered":"https:\/\/thechappellgroup.com\/?p=398"},"modified":"2018-12-21T00:18:18","modified_gmt":"2018-12-21T00:18:18","slug":"broward-county-solid-waste-operations-waste-to-energy-plants","status":"publish","type":"post","link":"https:\/\/thechappellgroup.com\/?p=398","title":{"rendered":"Broward County Solid Waste Operations Waste-to-Energy Plants"},"content":{"rendered":"<p><strong>Broward County Solid Waste Operations Waste-to-Energy Plants<\/strong><\/p>\n<p><strong>Contact:<\/strong> Mr. James W. Willard<br \/>\nSolid Waste Operations Division<br \/>\nWaste and Recycling Services<br \/>\n1 North University Drive, Suite 400-B<br \/>\nPlantation, Florida 33324<\/p>\n<p><strong>Construction Cost:<\/strong> $8,320,000.00<\/p>\n<p>The Chappell Group is the lead environmental consulting firm for monitoring and maintenance for six (6) wetland mitigation sites totaling over 300 acres around Broward County as part of the Environmental Preservation Program for Broward County Solid Waste Operations Division.<\/p>\n<p>These sites totaling over 300 acres include Tree Tops Park, East Everglades Area, Ash Landfill site, Hacienda Flores, Riverine, and the Broward Interim Contingency Landfill. The Chappell Group, Inc. assists the Program with the contracting process in awarding maintenance contracts, performs quarterly site inspections, identifies the areas requiring continued maintenance, and makes recommendations on how to improve and continue the sustainability<br \/>\nof all the mitigations sites. The Chappell Group, Inc. will perform these tasks for Broward County through 2008.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Broward County Solid Waste Operations Waste-to-Energy Plants Contact: Mr. James W. Willard Solid Waste Operations Division Waste and Recycling Services 1 North University Drive, Suite 400-B Plantation, Florida 33324 Construction Cost: $8,320,000.00 The Chappell Group is the lead environmental consulting firm for monitoring and maintenance for six (6) wetland mitigation sites totaling over 300 acres [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":399,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-398","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/thechappellgroup.com\/index.php?rest_route=\/wp\/v2\/posts\/398","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/thechappellgroup.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/thechappellgroup.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/thechappellgroup.com\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/thechappellgroup.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=398"}],"version-history":[{"count":3,"href":"https:\/\/thechappellgroup.com\/index.php?rest_route=\/wp\/v2\/posts\/398\/revisions"}],"predecessor-version":[{"id":1404,"href":"https:\/\/thechappellgroup.com\/index.php?rest_route=\/wp\/v2\/posts\/398\/revisions\/1404"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/thechappellgroup.com\/index.php?rest_route=\/wp\/v2\/media\/399"}],"wp:attachment":[{"href":"https:\/\/thechappellgroup.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=398"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/thechappellgroup.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=398"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/thechappellgroup.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=398"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}