Gateway Daytona Marina

Posted by admin - in Uncategorized - Comments Off on Gateway Daytona Marina

Gateway Daytona Marina
Daytona Beach, Volusia County, Florida

Client: Mr. Miceal O’Leary
Blue Water VI, LLC
312 SE 17th Street, 2nd Floor
Fort Lauderdale, FL 33316
Phone: (954) 410-4942

Services:

  • Environmental Design
  • Environmental Permitting
  • Benthic Survey
  • City Ordinance Approval

Construction Cost:
$150,000,000.00

The proposed project consists of the construction of a mixed use development which includes a marina, hotel, restaurant, and retail shops. The proposed marina includes the construction of a concrete deck, t-docks, finger piers and floating docks to accommodate 173 boat slips. In addition, maintenance dredging is proposed to a depth of (-)7.0 ft NGVD to match the historical depth of the surrounding area.

The Chappell Group, Inc. (TCG) provided all environmental services for the marina development including the necessary approvals with U.S. Army Corps of Engineers (ACOE), St. Johns River Water Management District (SJRWMD), U.S. Coast Guard (USCG), Florida Fish and Wildlife Conservation Commission (FFWCC), and US Fish and Wildlife Service (FWS). TCG provided all permitting services and design for the every aspect of the marina including the hotel transient dockage, day dockage, and Dock Master’s Office design. Because of the delay in of the slip allocation in the City of Daytona Beach and with the Volusia County MPP, TCG was able to assist with the Client and the City to expedite the drafting of the dock ordinance in order for the marina to be permitted in line with the Client’s timeline for completion.

Comments are closed.